Business field

Business field

/
/
/
Fracturing and flowback construction project of Humou well in western drilling in Xinjiang
Number of views:
1000

Fracturing and flowback construction project of Humou well in western drilling in Xinjiang

道森股份的压裂返排系统方案,广泛应用于国内油气开发,用于多口“明星井”,其中位于新疆塔城地区乌苏市境内的“高探1井”是一口风险探井。系统中除砂管汇主阀远程电动控制;20000psi压力级别;高温高压工况(-46℃~180℃)下性能优良;根据客户现场施工需求提供相应解决方案。
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0

成立于2001年,致力于为全球客户提供安全可靠的、高性能的油气开发设备和满足多种工况的全套系统解决方案。

咨询服务热线: 0512-65995065
关注我们

关注我们

访问手机网站

扫码访问手机网站

1
基本参数
Parameters
Scan the QR code to read on your phone
We could not find any corresponding parameters, please add them to the properties table

Large-scale fracturing and flowback construction project of Humou well in western drilling

 

Douson's fracturing flowback system solution is widely used in domestic oil and gas development, and is used in many "star wells", including Wusu City, Tacheng District, Xinjiang The "Gaotan 1 Well" is a risk exploration well. The main valve of the desanding manifold in the system is remotely controlled electrically; the pressure level is 20,000 psi; the performance is excellent under high temperature and high pressure conditions (-46℃ ~ 180℃); corresponding solutions are provided according to the customer's on-site construction needs.

 

Contact

 

Add: No. 16 West Henggang Street, Yangcheng Lake Industrial Park, Xiangcheng District, Suzhou City, Jiangsu Province

E-mail:info@douson.cn

WeChat account

 

公众号二维码

Scan us

 Copyright  2021 Suzhou Douson Drilling & Production Equipment Co., Ltd. Copyright    苏ICP备2024122235号-1