Product
Number of views:
1000
Integral Quick Installation Wellhead and Christmas Tree
The integral structure reduces the drilling and completion operation time and reduces the drilling and completion operation cost.
The blowout preventer components are installed once to complete the entire drilling process, improving the efficiency of drilling and completion operations.
Retail price
0.0
元
Market price
0.0
元
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
0
成立于2001年,致力于为全球客户提供安全可靠的、高性能的油气开发设备和满足多种工况的全套系统解决方案。
1
Basic parameters
Parameters
Scan the QR code to read on your phone
Nominal Bore Diameter |
2-1/16"~7-1/16" |
Working Pressure |
2000psi~15000psi |
Temperature Class | KU(-60℃~121℃) |
Material Class |
AA~HH |
Product Specification Level |
PSL1~PSL3G |
Performance Requirement |
PR1~PR2F |
Previous
None
Contact
Tel:+86-512-66738015
Add: No. 16 West Henggang Street, Yangcheng Lake Industrial Park, Xiangcheng District, Suzhou City, Jiangsu Province
E-mail:info@douson.cn
WeChat account
Scan us
Copyright 2021 Suzhou Douson Drilling & Production Equipment Co., Ltd. Copyright 苏ICP备2024122235号-1